Please use this identifier to cite or link to this item: https://www.um.edu.mt/library/oar/handle/123456789/27809
Title: Master plan should go
Authors: Ebejer, John
Keywords: Planning Authority (Malta)
Urban development -- Malta
City planning -- Environmental aspects -- Malta
Issue Date: 2016-11-26
Publisher: Allied Newspapers Limited
Citation: Ebejer, J. (2016). Master plan should go. The Sunday Times, pp.16.
Abstract: Several commentators have made the case for the Paceville master plan to be scrapped. I add my voice to these calls. My main arguments are based on major flaws in the process that led to the preparation of the master plan. There was no analysis of existing environmental and social conditions of the area. The plan preparation process should start with a careful analysis of the physical, environmental and social conditions of the area. Consultations at an early stage with people who live or work in the area are essential.
URI: https://www.um.edu.mt/library/oar//handle/123456789/27809
Appears in Collections:Scholarly Works - FacEMATou

Files in This Item:
File Description SizeFormat 
Master_plan_should_go.PDF1.44 MBAdobe PDFView/Open


Items in OAR@UM are protected by copyright, with all rights reserved, unless otherwise indicated.