Please use this identifier to cite or link to this item: https://www.um.edu.mt/library/oar/handle/123456789/28446
Full metadata record
DC FieldValueLanguage
dc.contributor.authorSalvachua, Belen-
dc.contributor.authorValentino, Gianluca-
dc.contributor.authorAberle, Oliver-
dc.contributor.authorAlbertone, J.-
dc.contributor.authorAthanasiadis, S.-
dc.contributor.authorBaglin, Vincent-
dc.contributor.authorBertarelli, Alessandro-
dc.contributor.authorBoccard, Christian-
dc.contributor.authorBruce, Roderik-
dc.contributor.authorCarra, F.-
dc.contributor.authorCattenoz, G.-
dc.contributor.authorChemli, S.-
dc.contributor.authorCoupard, J.-
dc.contributor.authorDerrez, C.-
dc.contributor.authorEsposito, Luigi Salvatore-
dc.contributor.authorFolch, R.-
dc.contributor.authorLamas, I.-
dc.contributor.authorLendaro, J.-
dc.contributor.authorLosito, Roberto-
dc.contributor.authorMarsili, Aurelien-
dc.contributor.authorMasi, Alessandro-
dc.contributor.authorMirarchi, Daniele-
dc.contributor.authorQuaranta, Elena-
dc.contributor.authorRedaelli, Stefano-
dc.contributor.authorRossi, Adriana-
dc.contributor.authorSexton, I.-
dc.date.accessioned2018-03-28T10:08:14Z-
dc.date.available2018-03-28T10:08:14Z-
dc.date.issued2014-
dc.identifier.citationSalvachua, B., Losito, R., Masi, A., Carra, F., Lendaro, J., Marsili, A., ... & Cattenoz, G. (2014). Collimation system post-LS1: status and commissioning. 5th Evian workshop on LHC beam operation, Evian-les-Bains. 111-116.en_GB
dc.identifier.urihttps://www.um.edu.mt/library/oar//handle/123456789/28446-
dc.description.abstractThe LHC collimation system has undergone an important upgrade during LS1. A total of 32 collimator installations are taking place to consolidate and improve the Run 1 system. This includes 18 new collimators with embedded beam positions monitors (BPMs), additional physics debris collimators, additional passive absorbers and re-installation or displacement of existing collimators. This paper summarizes the post-LS1 collimation layout, highlighting the expected gains from each modification, and the readiness of the new collimation hardware for commissioning without and with beam. Special emphasis is devoted to the new software for the control and configuration of the BPM collimators. A proposal for the necessary beam conditions during collimation alignment and validation with loss maps at 6.5 TeV is also discussed, including a strategy for the machine protection aspects. A list of early machine development studies is proposed.en_GB
dc.language.isoenen_GB
dc.publisherEvianen_GB
dc.rightsinfo:eu-repo/semantics/restrictedAccessen_GB
dc.subjectCollimators (Optical instrument) -- Calibrationen_GB
dc.subjectLarge Hadron Collider (France and Switzerland)en_GB
dc.titleCollimation system post-LS1 : status and commissioningen_GB
dc.typeconferenceObjecten_GB
dc.rights.holderThe copyright of this work belongs to the author(s)/publisher. The rights of this work are as defined by the appropriate Copyright Legislation or as modified by any successive legislation. Users may access this work and can make use of the information contained in accordance with the Copyright Legislation provided that the author must be properly acknowledged. Further distribution or reproduction in any format is prohibited without the prior permission of the copyright holderen_GB
dc.bibliographicCitation.conferencename5th Evian Workshop on LHC Beam Operationen_GB
dc.bibliographicCitation.conferenceplaceEvian-les-Bains, France, 02-04/06/2014en_GB
dc.description.reviewedpeer-revieweden_GB
Appears in Collections:Scholarly Works - FacICTCCE

Files in This Item:
File Description SizeFormat 
Collimation_system_post-LS1.pdf
  Restricted Access
943.44 kBAdobe PDFView/Open Request a copy
Collimation_system_post_LS1.pdf
  Restricted Access
4.8 MBAdobe PDFView/Open Request a copy


Items in OAR@UM are protected by copyright, with all rights reserved, unless otherwise indicated.