Please use this identifier to cite or link to this item:
https://www.um.edu.mt/library/oar/handle/123456789/28446
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Salvachua, Belen | - |
dc.contributor.author | Valentino, Gianluca | - |
dc.contributor.author | Aberle, Oliver | - |
dc.contributor.author | Albertone, J. | - |
dc.contributor.author | Athanasiadis, S. | - |
dc.contributor.author | Baglin, Vincent | - |
dc.contributor.author | Bertarelli, Alessandro | - |
dc.contributor.author | Boccard, Christian | - |
dc.contributor.author | Bruce, Roderik | - |
dc.contributor.author | Carra, F. | - |
dc.contributor.author | Cattenoz, G. | - |
dc.contributor.author | Chemli, S. | - |
dc.contributor.author | Coupard, J. | - |
dc.contributor.author | Derrez, C. | - |
dc.contributor.author | Esposito, Luigi Salvatore | - |
dc.contributor.author | Folch, R. | - |
dc.contributor.author | Lamas, I. | - |
dc.contributor.author | Lendaro, J. | - |
dc.contributor.author | Losito, Roberto | - |
dc.contributor.author | Marsili, Aurelien | - |
dc.contributor.author | Masi, Alessandro | - |
dc.contributor.author | Mirarchi, Daniele | - |
dc.contributor.author | Quaranta, Elena | - |
dc.contributor.author | Redaelli, Stefano | - |
dc.contributor.author | Rossi, Adriana | - |
dc.contributor.author | Sexton, I. | - |
dc.date.accessioned | 2018-03-28T10:08:14Z | - |
dc.date.available | 2018-03-28T10:08:14Z | - |
dc.date.issued | 2014 | - |
dc.identifier.citation | Salvachua, B., Losito, R., Masi, A., Carra, F., Lendaro, J., Marsili, A., ... & Cattenoz, G. (2014). Collimation system post-LS1: status and commissioning. 5th Evian workshop on LHC beam operation, Evian-les-Bains. 111-116. | en_GB |
dc.identifier.uri | https://www.um.edu.mt/library/oar//handle/123456789/28446 | - |
dc.description.abstract | The LHC collimation system has undergone an important upgrade during LS1. A total of 32 collimator installations are taking place to consolidate and improve the Run 1 system. This includes 18 new collimators with embedded beam positions monitors (BPMs), additional physics debris collimators, additional passive absorbers and re-installation or displacement of existing collimators. This paper summarizes the post-LS1 collimation layout, highlighting the expected gains from each modification, and the readiness of the new collimation hardware for commissioning without and with beam. Special emphasis is devoted to the new software for the control and configuration of the BPM collimators. A proposal for the necessary beam conditions during collimation alignment and validation with loss maps at 6.5 TeV is also discussed, including a strategy for the machine protection aspects. A list of early machine development studies is proposed. | en_GB |
dc.language.iso | en | en_GB |
dc.publisher | Evian | en_GB |
dc.rights | info:eu-repo/semantics/restrictedAccess | en_GB |
dc.subject | Collimators (Optical instrument) -- Calibration | en_GB |
dc.subject | Large Hadron Collider (France and Switzerland) | en_GB |
dc.title | Collimation system post-LS1 : status and commissioning | en_GB |
dc.type | conferenceObject | en_GB |
dc.rights.holder | The copyright of this work belongs to the author(s)/publisher. The rights of this work are as defined by the appropriate Copyright Legislation or as modified by any successive legislation. Users may access this work and can make use of the information contained in accordance with the Copyright Legislation provided that the author must be properly acknowledged. Further distribution or reproduction in any format is prohibited without the prior permission of the copyright holder | en_GB |
dc.bibliographicCitation.conferencename | 5th Evian Workshop on LHC Beam Operation | en_GB |
dc.bibliographicCitation.conferenceplace | Evian-les-Bains, France, 02-04/06/2014 | en_GB |
dc.description.reviewed | peer-reviewed | en_GB |
Appears in Collections: | Scholarly Works - FacICTCCE |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
Collimation_system_post-LS1.pdf Restricted Access | 943.44 kB | Adobe PDF | View/Open Request a copy | |
Collimation_system_post_LS1.pdf Restricted Access | 4.8 MB | Adobe PDF | View/Open Request a copy |
Items in OAR@UM are protected by copyright, with all rights reserved, unless otherwise indicated.