Please use this identifier to cite or link to this item:
https://www.um.edu.mt/library/oar/handle/123456789/29680
Title: | The risk assessment method in prognostic models of production systems management with account of the time factor |
Authors: | Mylnikov, Leonid Kuetz, Martin |
Keywords: | Production management -- Data processing Workflow management systems Management information systems Production management Risk assessment Production scheduling |
Issue Date: | 2017 |
Publisher: | University of Piraeus. International Strategic Management Association |
Citation: | Mylnikov, L., & Kuetz, M. (2017). The risk assessment method in prognostic models of production systems management with account of the time factor. European Research Studies Journal, 20(3A), 291-310. |
Abstract: | The possibility of planning risks assessment and the setting of the planning horizon are analysed with account of the time factor basing. A risk metrics approach is used, with risks estimated as a time function given in tabular form for the purposes of master production. Dependence of the integrated planning risks on the accuracy of forecasts used is proved and a time point is identified after which the risk assessment value increases sharply. The study enables to obtain the values of planning risks integral assessment in management problems using forecast data for groups of indicators and parameters involved in decision-making. |
URI: | https://www.um.edu.mt/library/oar//handle/123456789/29680 |
ISSN: | 11082976 |
Appears in Collections: | European Research Studies Journal, Volume 20, Issue 3, Part A |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
The_Risk_Assessment_Method_in_Prognostic_Models_of_Production_Systems_Management_2017.pdf | 808.04 kB | Adobe PDF | View/Open |
Items in OAR@UM are protected by copyright, with all rights reserved, unless otherwise indicated.