Please use this identifier to cite or link to this item: https://www.um.edu.mt/library/oar/handle/123456789/7431
Full metadata record
DC FieldValueLanguage
dc.date.accessioned2016-01-13T08:47:04Z-
dc.date.available2016-01-13T08:47:04Z-
dc.date.issued2013-
dc.identifier.urihttps://www.um.edu.mt/library/oar//handle/123456789/7431-
dc.descriptionB.ACCTY.(HONS)en_GB
dc.description.abstractPurpose: The Internal Capital Adequacy Assessment Process (ICAAP)'s introduction in the local banking sector sought to equip banks with tools to better analyse risks taken. This study will ascertain and analyse the major implications faced by the major banks in Malta due to the introduction of the ICAAP, as well as ascertain whether these banks follow ICAAP practices as in other European countries. Design: Semi-structured interviews were carried out with the seven major banks in Malta, selected on the basis of customer deposits. Findings: Various methods are adopted in the calculation and analysis of risks taken by the major banks in Malta. Some are similar to those adopted by foreign banks. Only two banks give priority of importance to the risks considered, while most banks prefer minimum target capital requirements in general for all risks rather than specifically for each risk. Total Own Funds is the main type of capital maintained by the major banks in Malta. Only one bank official stated that ICAAP had implications on the operations and strategy of the bank. Risk management practices also changed slightly, but mostly with the introduction of Basel II rather than with ICAAP per se. The relationship with the local regulator also experienced a minor change. Conclusions: ICAAP's introduction in the local banking sector had no major implications on the major banks in Malta. Also, methods similar to those used by foreign banks are adopted by the major banks in Malta, although these vary in size and proportion. Value: This study is fundamental as no similar study had been conducted in Malta, and thus such an analysis sheds light on capital management and risk management practices.en_GB
dc.language.isoenen_GB
dc.rightsinfo:eu-repo/semantics/restrictedAccessen_GB
dc.subjectBank capitalen_GB
dc.subjectRisk managementen_GB
dc.subjectBanks and banking -- Maltaen_GB
dc.titleThe internal capital adequacy assessment process : implications on major banks in Maltaen_GB
dc.typebachelorThesisen_GB
dc.rights.holderThe copyright of this work belongs to the author(s)/publisher. The rights of this work are as defined by the appropriate Copyright Legislation or as modified by any successive legislation. Users may access this work and can make use of the information contained in accordance with the Copyright Legislation provided that the author must be properly acknowledged. Further distribution or reproduction in any format is prohibited without the prior permission of the copyright holder.en_GB
dc.publisher.institutionUniversity of Maltaen_GB
dc.publisher.departmentFaculty of Economics, Management and Accountancy. Department of Accountancyen_GB
dc.description.reviewedN/Aen_GB
dc.contributor.creatorDebattista, Malcolm-
Appears in Collections:Dissertations - FacEma - 2013
Dissertations - FacEMAAcc - 2013

Files in This Item:
File Description SizeFormat 
13BACC034.pdf
  Restricted Access
1.99 MBAdobe PDFView/Open Request a copy


Items in OAR@UM are protected by copyright, with all rights reserved, unless otherwise indicated.