Title: Logistics simulation of a fabrication facility
Authors: Galea, Karl (2025)
Keywords: Manufacturing processes -- Malta
Logistics
Production management -- Malta
Small business -- Malta
Issue Date: 2025
Citation: Galea, K. (2025). Logistics simulation of a fabrication facility (Bachelor's dissertation).
Abstract: This project aims to improve the logistics processes of Domestica Ltd., a company in Malta that produces custom furniture. The DMAIC methodology is utilised to improve operational efficiency. The project examines two main stages: manufacturing operations in the fabrication facility and installation tasks performed at client locations. Time studies, simulation modelling, and stakeholder interviews provided detailed analysis of both stages to identify inefficiencies while reducing non-value-adding activities and enhancing workflow consistency. During production operations analysis, critical inefficiencies, unnecessary travel, and material storage issues emerged. The improvements aimed at standardising machine setting sheets, reorganising material storage, making workspace adjustments, and suggesting the installation of a gang rip saw to improve batching efficiency. Implementing these changes received validation through discrete event simulations in AnyLogic, which showed a 10–12% average time reduction across all door types. Layout adjustments were considered but eventually dismissed because the existing facility was already optimised, and significant structural modifications proved unnecessary. The process of installing doors outside the facility during the project's second phase was studied. The study identified site adjustment delays during architrave fitting, wasted time from unorganised toolkits, and excessive work being done on-site instead of at the facility. The thesis highlights the necessity of an ongoing improvement approach based on Kaizen principles instead of isolated interventions. The findings recommend developing an organisational culture that continuously empowers employees to identify and resolve inefficiencies instead of viewing the DMAIC cycle as a single event. According to this research study, structured analysis, practical interventions, and a lean oriented mindset improved the productivity and scalability of manufacturing and installation operations for a SME such as Domestica.
Description: B.Eng. (Hons)(Melit.)
URI: https://www.um.edu.mt/library/oar/handle/123456789/150599
Appears in Collections:Dissertations - FacEng - 2025

Files in This Item:
File Description SizeFormat 
2508ENRENR420000015925_1.PDF
  Restricted Access
4.73 MBAdobe PDFView/Open Request a copy


Items in OAR@UM are protected by copyright, with all rights reserved, unless otherwise indicated.