Please use this identifier to cite or link to this item:
https://www.um.edu.mt/library/oar/handle/123456789/77508
Title: | Robot time and cost management in the application to multiple production processes |
Authors: | Caruana, Maria (2012) |
Keywords: | Small business -- Malta Manufacturing industries -- Malta Production management Computer integrated manufacturing systems |
Issue Date: | 2012 |
Citation: | Caruana, M. (2012). Robot time and cost management in the application to multiple production processes (Master's dissertation). |
Abstract: | Typically, a manufacturing company will only consider the implementation of a robot to a production process if the annual product volume is high enough to ensure a high utilization of the robot and therefore an acceptable return on the investment. In particular, small and medium-sized enterprises (SMEs) often lack the production volumes, for each individual product or product family that they manufacture, that would justify the procurement of a robot using the traditional criterion. |
Description: | M.SC.ENG. |
URI: | https://www.um.edu.mt/library/oar/handle/123456789/77508 |
Appears in Collections: | Dissertations - FacEng - 1968-2014 Dissertations - FacEngIME - 2004-2015 |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
M.SC.ENG._Caruana_Maria_2012.pdf Restricted Access | 9.69 MB | Adobe PDF | View/Open Request a copy |
Items in OAR@UM are protected by copyright, with all rights reserved, unless otherwise indicated.