Please use this identifier to cite or link to this item:
https://www.um.edu.mt/library/oar/handle/123456789/149123| Title: | The Malta-Gozo air service : part III : the furore over an airfield |
| Authors: | Bezzina, Joseph |
| Keywords: | Aeronautics, Commercial -- Malta -- Gozo -- History Airports -- Planning Transportation -- Malta -- Gozo -- History Helicopter transportation -- Malta -- Gozo -- History Air travel -- Malta -- Gozo -- History |
| Issue Date: | 2026 |
| Publisher: | Gozo Regional Development Authority |
| Citation: | Bezzina, J. (2026). The Malta-Gozo air service : part III : the furore over an airfield. Perspettivi : a Gozo Review, 8, 60-91. |
| Abstract: | This is the third part of a study outlining the early endeavours for the provision of a permanent airlink between Malta and Gozo. The first part outlined the early attempts to provide this service; the second part proceeded with a review of the attempts to launch this airlink by helicopter. A trail service finally took off on 27 June 1990 and it was resumed the following year. Those cherishing the welfare of the Gozitans urged the hastening of the next step – an airfield for fixed-wing aircraft that would cut both costs and fares. For several weeks, the correspondence columns of local newspapers, overflowed with opinions about the project. Many were critical rather than supportive; the majority jumped to fallacious conclusions. The airlink was however upgraded with the extension of the landing area and the building of a proper helicopter terminal. The discussion in the meantime rages on. |
| URI: | https://www.um.edu.mt/library/oar/handle/123456789/149123 |
| Appears in Collections: | Issue 8 : 2026 |
Files in This Item:
| File | Description | Size | Format | |
|---|---|---|---|---|
| The_Malta-Gozo_air_service_part_III_the_furore_over_an_airfield_2026.pdf | 16.02 MB | Adobe PDF | View/Open |
Items in OAR@UM are protected by copyright, with all rights reserved, unless otherwise indicated.
