Please use this identifier to cite or link to this item:
https://www.um.edu.mt/library/oar/handle/123456789/38958
Title: | Unruly works division |
Authors: | Deidun, Alan |
Keywords: | Malta Environment and Planning Authority Land use -- Environmental aspects -- Malta Property -- Malta -- Gozo Non-governmental organizations -- Malta |
Issue Date: | 2006-03-19 |
Publisher: | Allied Newspapers Ltd. |
Citation: | Deidun, A. (2006, March 19). Unruly works division. The Times of Malta, pp. 1-3. |
Abstract: | This column has often revealed the uncouth ways adopted by the Works Division, which frequently show utter disregard for the planning process by proceeding with works before permits are actually in hand - cases in point are the works at Wied Ghollieqa and Salina. Recently, Works were involved in the excavation of a stormwater culvert in a valley bed at Gharghur without permit and an enforcement notice was meted out in this case. It was only after works had actually started that baseline studies concerning the removal of trees on site, etc., were presented. The same thing happened at the Nature 2000 site of Wied Babu in Zurrieq - after MEPA halted procedures for the construction of the obsolete belvedere because of a breach of the permit conditions, works on site still proceeded on March 8, as local residents can testify. |
URI: | https://www.um.edu.mt/library/oar//handle/123456789/38958 |
Appears in Collections: | Scholarly Works - FacSciGeo |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
Unruly_works_division.pdf | 1.93 MB | Adobe PDF | View/Open |
Items in OAR@UM are protected by copyright, with all rights reserved, unless otherwise indicated.